What ฿1.2M of construction means, said plainly. The warranty and how to use it. The checklist we hand you at handover. And what happens if we do not finish Phase 2.

Phase 2 under construction: a half-built terrace block with precast wall panels being craned into place, red laterite cut into terraces, a muddy site road, workers in hi-vis, a site engineer with rolled drawings, flat grey overcast light.

The construction, in plain words

Foundation
Driven RC piles (I-22), about 21 m to the firm sand layer. Bo Win is rolling ground, not Bangkok soft clay — piling is still required and done.
Structure
RC column-and-beam frame. External and party walls are 100 mm precast concrete panels. Internal partitions are lightweight AAC block or metal-stud with fibre-cement.
The party wall
One shared 100 mm precast panel between your unit and the neighbour’s. You will hear a dropped pot or a loud television through it; you will not usually hear conversation. If sound matters, the end units have no shared wall on one side and cost ฿120,000–200,000 more.
Roof
Type A: 0.35 mm metal sheet with a PE foil on steel purlins. Types B and C: concrete roof tile on a steel truss. 9 mm gypsum flat ceiling throughout.
Roof insulation — not standard
An upgrade: Type A ฿18,000 / Type B ฿26,000 / Type C ฿32,000 (100 mm glass wool plus a radiant foil). It drops the upstairs late-afternoon temperature about 3–5 °C and pays for itself in aircon running cost in roughly 4 years. Buy it.
Windows
Aluminium frame, single 6 mm glass, sliding. Not double glazed.
Ceiling height
2.60 m ground floor, 2.50 m upper.
Water
Municipal supply. Types B and C include a 1,000 L tank and a booster pump — Bo Win’s evening supply pressure genuinely drops. Type A can add the same for ฿9,500 and we recommend it.

The warranty, and how to use it

Developer defect-fix period (all general work)1 year from transfer
Structure (foundations, columns, beams, load-bearing walls, roof structure) — OCPB standard contract5 years
Components (finishes, doors, sanitary, electrical, waterproofing) — OCPB standard contract1 year

The handover inspection

Two rounds: (1) you inspect → we list and fix → (2) you re-inspect → transfer. You do not sign the transfer or pay the balance until the round-2 list is closed.

Bring your own inspector if you want. A private company charges ฿4,000–6,000 for a townhouse. We think it is sensible and we do not take it personally.

The checklist we hand you

  • ·Doors and windows — alignment, gaps, locks, smooth slide
  • ·Floor tiles — knuckle-tap every tile for hollow spots; coin-check lippage
  • ·Walls — map and date every crack in pencil
  • ·Every electrical point — plug a tester in
  • ·Every tap and drain — run it, time the drain, check underneath for leaks
  • ·Roof cavity — look for daylight and water stains
  • ·Bathroom and terrace floors — pour a bucket and watch where the water goes
  • ·Paint finish, and the meter readings written down
A person crouched at a wall with a checklist and a torch, knuckle-tapping a floor tile, chalk circles on the wall, a spirit level on the sill.

Phase 2 progress

as of 31 Aug 2026
Phase 2 — scheduled handover by block202620272028nowDFeb 2027EMay 2027FSep 2027GFeb 2028HJun 2028JOct 2028

What if we do not finish Phase 2

The allocation licence forces the infrastructure

Licence no. 12/2567 legally requires the roads, drainage, street lighting, central area and perimeter to be completed, secured by a ฿9,200,000 bank guarantee lodged with the Chonburi Land Office. If Rakthan fails, the guarantee funds the completion.

Your exposure before transfer is small

You pay ฿40,000–90,000 in total before the house is built and inspected. The other 96%+ is the bank’s mortgage money, paid on transfer day when the title is already in your name. See the loan-declined and 12-month-late refund clauses on the cost page.

Three finished estates you can drive to

Rakthan Phan Thong (2017), Rakthan Ban Bueng (2019), Rakthan Nong Yai (2022) — all in Chonburi, all with a formed juristic person, all still standing. Go and look at a 9-year-old one before you sign.

Who is building it

Rakthan Property Co., Ltd. — Registered in Chonburi, 2015 (reg. no. 0205558xxxxxx). Paid-up capital ฿50,000,000. Family-run, regional, not listed on the stock exchange. No directors are named on this site — the company is a registration number, a capital figure and three addresses you can drive to.

Completed projectDistrictYearUnitsStatus
Rakthan Phan ThongPhan Thong201788sold out; juristic person formed 2019
Rakthan Ban BuengBan Bueng2019132sold out; juristic person formed 2021
Rakthan Nong YaiNong Yai202296~4 remaining; juristic person formed 2024

Structural and civil work is by a main contractor Rakthan has used since Phan Thong; precast panels are cast at a plant in Chonburi. No real contractor or manufacturer is named. · Land-allocation licence no. 12/2567