Skip to content

Estate & common fee

168 homes on 15 rai, in two phases. What the common fee covers and what it does not, the published first-year budget, and how long it really takes to get to work.

Rakthan Bo Win — site planRoute 331 frontage roadgateAA1 · B · ฿1,740,000A2 · A · ฿1,190,000A3 · A · ฿1,190,000A4 · B · ฿1,590,000A5 · A · ฿1,190,000A6 · B · ฿1,590,000A7 · A · ฿1,190,000A8 · A · ฿1,190,000A9 · B · ฿1,590,000A10 · A · ฿1,190,000A11 · B · ฿1,600,000A12 · A · ฿1,200,000A13 · A · ฿1,200,000A14 · B · ฿1,600,000A15 · A · ฿1,200,000A16 · B · ฿1,600,000A17 · A · ฿1,200,000A18 · B · ฿1,600,000A19 · A · ฿1,200,000A20 · A · ฿1,210,000A21 · B · ฿1,610,000A22 · A · ฿1,210,000A23 · B · ฿1,610,000A24 · A · ฿1,210,000A25 · A · ฿1,210,000A26 · B · ฿1,610,000A27 · A · ฿1,210,000A28 · B · ฿1,760,000BB29 · B · ฿1,740,000B30 · B · ฿1,590,000B31 · A · ฿1,190,000B32 · A · ฿1,190,000B33 · B · ฿1,590,000B34 · A · ฿1,190,000B35 · B · ฿1,590,000B36 · A · ฿1,190,000B37 · B · ฿1,590,000B38 · A · ฿1,190,000B39 · A · ฿1,200,000B40 · B · ฿1,600,000B41 · A · ฿1,200,000B42 · B · ฿1,600,000B43 · A · ฿1,200,000B44 · A · ฿1,200,000B45 · B · ฿1,600,000B46 · A · ฿1,200,000B47 · B · ฿1,600,000B48 · A · ฿1,210,000B49 · A · ฿1,210,000B50 · B · ฿1,610,000B51 · A · ฿1,210,000B52 · B · ฿1,610,000B53 · A · ฿1,210,000B54 · B · ฿1,610,000B55 · A · ฿1,210,000B56 · B · ฿1,760,000CC57 · C · ฿2,380,000C58 · C · ฿2,290,000C59 · C · ฿2,290,000C60 · C · ฿2,290,000C61 · C · ฿2,290,000C62 · C · ฿2,290,000C63 · C · ฿2,290,000C64 · C · ฿2,290,000C65 · A · ฿1,190,000C66 · B · ฿1,590,000C67 · A · ฿1,200,000C68 · B · ฿1,600,000C69 · A · ฿1,200,000C70 · A · ฿1,200,000C71 · B · ฿1,600,000C72 · A · ฿1,200,000C73 · B · ฿1,600,000C74 · A · ฿1,200,000C75 · A · ฿1,200,000C76 · B · ฿1,610,000C77 · A · ฿1,210,000C78 · B · ฿1,610,000C79 · A · ฿1,210,000C80 · B · ฿1,610,000C81 · A · ฿1,210,000C82 · A · ฿1,210,000C83 · B · ฿1,610,000C84 · B · ฿1,760,000DD85 · B · ฿1,740,000D86 · A · ฿1,190,000D87 · B · ฿1,590,000D88 · A · ฿1,190,000D89 · A · ฿1,190,000D90 · B · ฿1,600,000D91 · A · ฿1,200,000D92 · B · ฿1,600,000D93 · A · ฿1,200,000D94 · A · ฿1,200,000D95 · B · ฿1,610,000D96 · A · ฿1,210,000D97 · B · ฿1,610,000D98 · B · ฿1,760,000EE99 · B · ฿1,740,000E100 · A · ฿1,190,000E101 · B · ฿1,590,000E102 · A · ฿1,190,000E103 · A · ฿1,190,000E104 · B · ฿1,600,000E105 · A · ฿1,200,000E106 · B · ฿1,600,000E107 · A · ฿1,200,000E108 · A · ฿1,200,000E109 · B · ฿1,610,000E110 · A · ฿1,210,000E111 · B · ฿1,610,000E112 · B · ฿1,760,000FF113 · B · ฿1,740,000F114 · A · ฿1,190,000F115 · A · ฿1,190,000F116 · B · ฿1,590,000F117 · A · ฿1,190,000F118 · B · ฿1,600,000F119 · A · ฿1,200,000F120 · B · ฿1,600,000F121 · A · ฿1,200,000F122 · A · ฿1,200,000F123 · B · ฿1,610,000F124 · A · ฿1,210,000F125 · B · ฿1,610,000F126 · B · ฿1,760,000GG127 · B · ฿1,740,000G128 · A · ฿1,190,000G129 · A · ฿1,190,000G130 · B · ฿1,590,000G131 · A · ฿1,190,000G132 · B · ฿1,600,000G133 · A · ฿1,200,000G134 · A · ฿1,200,000G135 · B · ฿1,600,000G136 · A · ฿1,200,000G137 · B · ฿1,610,000G138 · A · ฿1,210,000G139 · B · ฿1,610,000G140 · B · ฿1,760,000HH141 · B · ฿1,740,000H142 · A · ฿1,190,000H143 · A · ฿1,190,000H144 · B · ฿1,590,000H145 · A · ฿1,190,000H146 · B · ฿1,600,000H147 · A · ฿1,200,000H148 · A · ฿1,200,000H149 · B · ฿1,600,000H150 · A · ฿1,200,000H151 · B · ฿1,610,000H152 · A · ฿1,210,000H153 · A · ฿1,210,000H154 · B · ฿1,760,000JJ155 · C · ฿2,380,000J156 · C · ฿2,290,000J157 · C · ฿2,290,000J158 · C · ฿2,290,000J159 · C · ฿2,290,000J160 · C · ฿2,295,000J161 · C · ฿2,295,000J162 · C · ฿2,295,000J163 · B · ฿1,600,000J164 · A · ฿1,200,000J165 · B · ฿1,610,000J166 · A · ฿1,210,000J167 · B · ฿1,610,000J168 · B · ฿1,760,000retention pondsala + playground
availablereservedcontracttransferredPhase 1: blocks A–C · Phase 2: D–J
Land
~15 rai (≈ 24,000 m²)
Units
168 (84 + 84)
Licence
Land-allocation licence no. 12/2567
Utility bank guarantee
฿9,200,000

A guardhouse and boom gate; 24-hour security (2 guards); a perimeter wall; a covered sala with concrete benches; a lawn with two pieces of play equipment; a stormwater retention pond; street lighting; the internal roads and the central drain.

Phase 1 — Handed over. All 84 units transferred; 71 occupied.

Phase 2 — Under construction. Staggered handover Feb 2027 – Oct 2028. 28 units contract-signed, 19 reserved, 37 available.

The juristic person & the common fee

The juristic person for the estate (นิติบุคคลหมู่บ้านจัดสรร) is formed when Phase 2 is handed over or 50% of all plots by area have transferred, whichever comes first — the Land Allocation Act threshold. Until then Rakthan runs the common area and covers the shortfall between the fee collected and the real cost. The first-year budget is published so you can see the fee is realistic and will not jump when the juristic person takes over.

First-year budget (published)

Security (2 guards, 24 h)฿480,000
Electricity — street + common฿120,000
Road & central-drain maintenance฿90,000
Common landscaping + refuse฿110,000
Repairs + reserve฿130,000
Admin + insurance฿70,000
Total฿1,000,000

Fees collected at full occupancy come to ฿1,167,360 a year; the surplus goes to the reserve. During Phase 2, Rakthan covers the gap for the roughly 90 unoccupied units. (collected ฿1,167,360/yr)

Getting to work

Tokmmotocarpeak
Amata City Rayong, main gate79 min15 min25–30 min
Hemaraj Eastern Seaboard (H-ESIE)1114 min20 min30 min
Pinthong Industrial Estate 1–56–138–17 min
Bo Win fresh market + Makro35 min8 min
Laem Chabang port2830 min45 min
Sriracha town (Robinson, hospital)2225 min35 min
Pattaya3235 min
The Route 331 frontage road: a songthaew pickup-bus at the roadside stop, power lines, a factory perimeter wall in the hazy distance, a motorbike with a sidecar, overcast.

Public transport. Songthaew on the Route 331 frontage every ~20 minutes, 05:20–19:40, ฿15 flat to the Bo Win junction. Nothing after about 20:00 — a night-shift worker needs their own motorcycle.

Health. Bo Win community clinic is 3 km / 6 minutes (daytime, minor). The nearest hospital with a 24-hour emergency room is in Sriracha, about 22 km / 25 minutes. This is not next to a hospital.

Schools. Two government primary schools within 4 km; the nearest government secondary school is 9 km. Bilingual and English-program schools are in Sriracha and Pattaya, 30+ minutes away. If you need an English-program school, this is not the estate for you.

Flood

Bo Win is rolling ground on the Eastern Seaboard watershed, not a flood plain. The estate sits at about +18 m. Phase 1 did not take water in the heavy events of 2013 or 2022. Internal drainage is sized for 60 mm/hr; the low H/J corner has a retention pond as a second line. The 2011 central-Thailand floods did not reach this district.